Original Reservoir
Original Pump House
Caustic Tank inside old Pump House
UV Lamp System. Note Heater to keep Caustic warm in winter,
Instructions on how to use Pager to receive Alerts from Pup House.
Preparation for 4x new 25k Litre plastic tanks.
New plastic tanks in place.
New Pump Shed 2014
Inside new Pump House showing Caustic Tank and UV Treatment system.
The Primary and Secondary filters.
Entrance into Pump House
Electrical Switchboard area.
Pump controls.
Mains Shutoff valve at bottom of Reservoir hill. Oct 2016
Looking for Burnetts Road Shutoff Valve October 2016
Line from X-Junction to few house down left side of Upper Plain Road. Should be a straight line, but look at that S shape.
Looking across to X-Junction from lamp post on Upper plain Road.
The X-Junction where line is taken off to go to Burnetts Road and part way down left hand side of Upper Plain Road.
Building of new fence around Reservoir, January 2019
New Pipe support for Rising Main and pipes coming down from Reservoir. June 2020
Air Valve on Rising main. Halfway up hill to reservoir
Gathered to start Working Bee. November 2020
Time for a Coffee/Tea break.
Working Bee finished. Time for lunch.
After Wooden Tank removal.
Preparing to pump in another 200 Litres of 50% Caustic Soda. April 2024
Caustic Soda Tank being filled up.
Pumping in the Caustic Soda 50%.
New Shutoff valve box being setup.
Shutoff Valve
A new expertly made Shutoff Valve Box completed.
Addon Timber Tank and 4 Plastic tanks.
Addon Air Valve.
Connecting in 3x 30k Litre tanks
Wifi Remote monitoring, online, 8/2024
Caustic Pump Service Msg Aug24
Team just moved in another Tank. Sept 24